Photo Gallery  
 


Repair and Maintenance :

Ball Mill :

Ball Mill weighing 25MT broken end drive shaft removed and replaced with new shaft. Concentricity maintained within 0.05mm with reference to the tail end shaft. This work was completed in a time span of 21 days.

 
Aligning the Ball Mill Face.
 
Aligning the Ball Mill Side.
     
 
Removing Old Shaft
 
Fixing of new shaft (4.jpg,5.jpg)
     
   
     

Repair and Reconditioning:

1600 T Clutch Assembly :

 

 

End cover of Heat exchanger

Diesel, Petrol, Desalinated water and water Tanks designed as per API 650. Fabrication, Erection welding sand blasting food grade epoxy Painting and commissioning carried out in Maldives.

 
 

Sugarcane crusher drive shaft and gear assembly

 
 

1600 T Mechanical Forging Press

Dismantling, repairing the Crank shaft, Connecting rod and Gears of 1600 T press, which includes Machining, Shaft Grinding, Blue Matching, Dry ice shrink fitting, assembly and testing.

 
 
 
     
     

 

 